YAMAHA Pick and Place Machine 当前位置: Home >>News>>YAMAHA SMT
YAMAHA production line of EMS

Proposal for production line of EMS

SMT line that realizes both high-mix production and high-quality/high-productivity production

Outline of applications

Subject

Labor saving

Industry

EMS

Type of production

Variable Mix - Variable Volume production

Solution

Commonization of changeover work by utilizing universal heads and a grouping function to minimize changeover counts.

Machines to be installed

YSP10YSi-SPYRM20 and YSi-V

Proposal for production line
 

Examples of customers’ problems and needs

Dealing with odd-shaped components

Dealing with odd-shaped or tall components causes the operation to lose time balance and prevents increased productivity.

Changeover work

Changeover work including replacement of feeder carriages consumes much work and time generating a machine down-time.

New product type

The production of a new type of product needs to reach the maximum output from the beginning.

Solution

Dealing with odd-shaped components

(YRM20R): The HM head can handle a wide variety of components from 0201mm to W55 × L100 mm.
Yamaha’s original technique of dramatically shortening the head traveling distance and dual-stage mounting enables high-speed mounting of odd-shaped or tall components.

Changeover work

(YSM20WR): The large feeder bank improves the effectiveness of the changeover work commonization. Compact carriages are easy to handle.

New product type

(YSUP): For a new type of product, the new program can easily be created by scanning sample PCB and converting gerber data.

Expected introduction effects

Dealing with odd-shaped components

Producing various types of products is available. It maintains the cycle time for a wide variety of product types, which makes it possible to realize high productivity as a whole, In spite of the fact that it is handling odd-shaped or tall components.

Changeover work

This line reduces the burden of changeover work on operators, leading to improvement in machine operation rate and reduction in operational errors.

文章From:http://www.ledpickandplace.com/te_news_bulletin/2021-09-07/28964.chtml